Skip to content
1925 color postcard showing Joplin Memorial Hall shortly after construction

Dedicated October 18, 1925 · Joplin, Missouri

Built to honor. Worth saving.

For a century, this hall has carried Joplin’s music, memories, service, and resolve. Its next chapter is ours to write.

Why it was built

Joplin built it for
those who served.

After World War I, Robert S. Thurman American Legion Post 13 and its Women’s Auxiliary helped lead the campaign for a permanent memorial and civic gathering place. Joplin voters approved construction bonds by roughly three to one in 1923.

Designed by August and Alfred Michaelis in the Classical Revival style, the $250,000 hall was dedicated in 1925 before a crowd of about 2,000.

Walk through the full history
1925 Dedicated as a veterans memorial and civic auditorium
4,000+ Original planned capacity for the region’s largest indoor hall
2021 Listed in the National Register of Historic Places

The archive remembers

One hall.
Thousands of nights.

Programs, handbills, and ticket stubs preserve the everyday evidence of a place that belonged to the whole region.

1945 Central District Boy Scout Circus program naming Joplin Memorial Hall
1945 Boy Scout Circus program
Late-1970s Brownsville Station concert handbill for Joplin Memorial Auditorium
Late 1970s Brownsville Station handbill
1999 Gallagher ticket for a performance at Joplin Memorial Hall
1999 Gallagher performance ticket
Joplin Memorial Hall standing behind temporary fencing while closed Closed to public gatherings since 2020

Where things stand · July 2026

Closed.
Not forgotten.

Corrosion contributed to a partial collapse of the west auditorium roof in June 2020. Engineers also documented settlement, masonry cracking, water intrusion, and aging systems. The auditorium remains closed; the building is used mainly for municipal offices and storage.

Demolition is no longer the city’s active direction. The City Council has backed a Friends of Joplin Memorial Hall rehabilitation framework—but no construction is underway, and the financing conditions have not yet been met.

Current reality Preservation has a path. It does not yet have a finished funding package.
Read the closure chapter

The rehabilitation proposal

Honor the past.
Reopen the future.

Architectural rendering of a rehabilitated Joplin Memorial Hall with an active civic plaza Concept rendering · SFS Architecture

The Friends-led proposal would preserve Memorial Hall as an approximately 2,200-seat multi-use auditorium. It would repair the structure, replace failing systems, modernize the stage and backstage areas, preserve every war memorial, and retain an emergency-response role.

Study the preservation plan
$16.74M
Current proposed rehabilitation budget, including contingency
≈ 2,200
Planned seats in a restored multi-use auditorium
$2M
Separate community campaign goal for bridge, startup, and operations

What still has to happen

01

A local vote

Voters must approve raising Joplin’s lodging tax from 4% to 6%. As of July 30, 2026, a ballot date had not been formally finalized.

02

A community campaign

The Friends proposal calls for $2 million in private support, alongside preservation and New Markets tax credits.

03

Final financing

The city’s proposed $7 million bond issue remains conditional on the tax increase, fundraising, final plans, and construction financing.

The next chapter

A century ago, Joplin chose to build it.
Now Joplin chooses what comes next.

Learn the whole story, follow the rehabilitation process, and help keep the public conversation grounded in what this building has meant—and what it can still become.

Fresh reels! leon casino australia - check games!